Log in

Log in

The paper outlines the study to identify bottlenecks, options and approach for the most feasible uprate route.

It also covers execution strategy to minimize production loss. Commissioning problems and remedial actions have also been discussed.

The revamp scheme has been successful with reduced energy consumption and the plant operating at enhanced capacity.

The paper also covers considerations for future revamp.

 

 

Attachments:
Download this file (1998_ifa_marrakech_basit.pdf)1998_ifa_marrakech_basit.pdf[ ]577 kB