• LESER, The Safety-Valve.com

    LESER, The Safety-Valve.com

  • FLUITEC Measure. Consult. Treat.

    FLUITEC Measure. Consult. Treat.

  • GRANDPERSPECTIVE: We make visible the invisible hazard

    GRANDPERSPECTIVE: We make visible the invisible hazard

  • SPRANA: The UAN Analyzer

    SPRANA: The UAN Analyzer

  • CRU’s Sustainable Fertilizer Production Technology Forum, 20-23 September 2021

    CRU’s Sustainable Fertilizer Production Technology Forum, 20-23 September 2021

My UreaKnowHow

Both username as well as password are capital sensitive.

Our Sister Websites

 

 

 

 

 

 

 

Statistics

Members:
UreaKnowHow.com: 7200+
UreaKnowHow.com & UreaNet.cn: 13200+
AmmoniaKnowHow.com: 1200+
 
Topics: 2000+
Posts: 9800+
Average posts per topic: 5+
Average posts per day: 2-3
 
Libraries:
Photos: 1200+
Videos: 340+
 
Revamp Guides: 
 
 

Safety Information

Total:
- Safety Risks in Urea Plants: 200+
- Safety Risks in Ammonia Plants: 1200+
 
Specific:
- Ammonia Feed Piping Risks: 10+
- Risks during Turnarounds: 10+
For our complete overview of Safety Risks, Incidents and Near Misses, check out FIORDA

Follow us

LinkedinYoutube

Study for the Life Time Extension was based on Desk Study as well as Field Inspections, both by the Licensor. Desk study of all relevant data received from Al bayroni with respect to inspection and maintenance history, average weather conditions in Al Jubail (to assess the risks for atmospheric corrosion) and other relevant data, such as failure investigation reports; was conducted in Licensor office. On-site inspections were planned & performed during an already planned TA in April/May2013 by Licensor team himself. These inspections consisted of visual examination, endoscopic examination and ultra-sonic thickness measurements (both by point-thickness readings and surface-scanning).

 

Urea World News