  • in reply to: Urea plant start-up & Shut down problems #102119
    salem842
    Participant
      • Participant

      In addition the most common problems during start up :

      – CO2 reversal.
      – Losing of level indication of the Reactor or Stripper.
      – Chocking of process important lines.
      – Any of the synthesis control valves malfunctioning.

      in reply to: Passivation layer #102032
      salem842
      Participant
        • Participant
        in reply to: Passivation layer #102024
        salem842
        Participant
          • Participant

          Tanks Mark,,

          Good day,,

          sulfur, chlorides, heat tints create issues
          How to monitor these material & making sure of the Oxide layer formation ?

          What about the use of passivators?

          Regards

          in reply to: HP Stripper tube wall thickness #102019
          salem842
          Participant
            • Participant

            For mat
            BC.01 what is the minimum tube nominal wall thicknesses?

            Thanks

            in reply to: Passivation air in the Synthesis loop #102018
            salem842
            Participant
              • Participant

              What is the latest time limit of blocking in by STC.

              Regards

              in reply to: HP vs LP start up procedure #102017
              salem842
              Participant
                • Participant

                When it comes to the hp start up & raising the pressure, that would system would contain amount of Co2 & air which it took more than 2 hours of pressurizing..
                Comparatively in LP start up you are loosing it..

                Doesn’t it make sense?

                in reply to: Urea Product Analysis #102003
                salem842
                Participant
                  • Participant

                  Thanks for the answer ..

                  How often the test should be taken?
                  What are the normal values of Nickel in urea product..

                  Regards

                  salem842
                  Participant
                    • Participant

                    Dear Friend,

                    I absolutely agree with what norozi said ”
                    As you know the carbamate formation is an exothermic reaction and if the pressure of steam drum decrease .More CO2 and NH3 will be condensed and finally total partial pressure of the gasses in the synthesis decrease .In this case the pressure of the synthesis will be decreasd. and vice versa ”

                    In addition the drums pressure has also slight effect on the Reactor level, as the drum pressure increases, more heat is supplied to the endothermic urea reaction, which results in yielding more urea and ultimately higher Reactor level, and vice versa,

                    salem

                    salem842
                    Participant
                      • Participant

                      Dear friend

                      As far as i know, the purpose of this line is to maintain minimum solution to the ejector, in case carbamte pump trips.

                      If you have frequent flange leak at this line, flange can be removed and the can connected directly without a flange.

                      thanks
                      salem

                      in reply to: how can control the bucket speed #97636
                      salem842
                      Participant
                        • Participant

                        Dear friend,

                        If you reached minimum bucket speed and still have product size problem,
                        seek for assistant from Rotary or Electrical staff,
                        there must be a way to reduce the bucket speed further.

                        Regards
                        salem

                        in reply to: Air Leak Test Pressure ! #97631
                        salem842
                        Participant
                          • Participant

                          Dear Mark,

                          Max 0.5 kg pressure is applied to make sure that the gab between the Stainless layer & Carbon steel pressure layer is clear & leak detection system is intact.

                          Back to the question, what is the max. pressure used for air air pressure test in a Heat exchanger for instant, HPCC or HP scrubber.

                          Regards
                          salem!

                          salem842
                          Participant
                            • Participant

                            Dear Ahmad,

                            To avoid high carbamate concentration in the recovery section ,

                            1- As much as possible go for NH3 side.
                            2- Carry out Carbamate local solidification tests, at pump suction.
                            3- maintain CW, for LPCC at slightly higher temperature.
                            4- Dilute carbamate concentration of the recovery section.

                            Regards
                            salem

                            in reply to: Air Leak Test Pressure ! #97623
                            salem842
                            Participant
                              • Participant

                              As of our experience the applied pressure for Air pressure test is 1/4 the design pressure at the shell side,

                              If any one has the equation for this type of test, please !

                              Regards
                              Salem

                              in reply to: Air Leak Test Pressure ! #97619
                              salem842
                              Participant
                                • Participant

                                Dear M. Faroq

                                It is not possible to carry out CO2 pressure test to identify leaky tube of Heat Exchanger,
                                CO2 pressure pressure test is used to identify HP loop leaks,
                                Therefore, to locate a particular leaky tube in Heat exchanger you need to go for HPT, NH3, Helium or Inst Air test,

                                Regards
                                Salem

                                in reply to: Air Leak Test Pressure ! #97617
                                salem842
                                Participant
                                  • Participant

                                  Dear norozi,
                                  Thank you for your attention,
                                  My question was not about Synthesis loop pressure test, it was about instrument air pressure value at shell side of Heat Exchanger to identify leaky tube in HPCC or HP scrubber for instant,

                                  Regards !
                                  salem

                                Viewing 15 posts - 1 through 15 (of 19 total)
                                UreaKnowHow

                                UreaKnowHow.com is an independent group of nitrogen fertilizer specialists with an impressive number of years experience in designing, maintaining and operating nitrogen fertilizer plants.

                                Solution Providers offer their solutions to improve our member’s plants performance.