  • in reply to: Radiometric Belt weight measurement of final product #116427
    norozi1972
    Participant
      • Expert

      Advantages of the new Radiometric Belt weight measurement of any final product like urea :
      *very accurate against mechanical current device.
      *Easy installation
      *No any contact with the product
      *Removal of all mechanical connections and belt mechanical stress and tension
      *Without any maintenance
      Very low price,
      you can contact with us through an email for any question and clarification:
      ammoniaurea.ir@gmail.com

      in reply to: radiometric N/C meter #116425
      norozi1972
      Participant
        • Expert

        Advantages of the new N/C meter radiometric device:
        *very accurate
        *Easy installation
        *No contact with the high pressure process
        *No chocking phenomena ,No very dangerous of high pressure process leakage.
        *Removal of all connections and related equipment
        *Without any maintenance
        Very low price, about a fifth of the current equipment price.
        you can contact with us through an email for any question and clarification:
        ammoniaurea.ir@gmail.com

        in reply to: radiometric N/C meter #116357
        norozi1972
        Participant
          • Expert

          Real picture of new radioactive NC meter that is in operation since two years ago.

          in reply to: radiometric N/C meter #116354
          norozi1972
          Participant
            • Expert

            You can see the difference clearly in the real images of the two devices.

            in reply to: Prilling Tower Scraper Urea Deposit #102134
            norozi1972
            Participant
              • Expert

              Dear NASEEM
              We faced with this problem and the cleaning of scrapper arm was very difficult. An idea from one of our engineering department expert ,we used a nano-paint to cover part of the scraper arm. After a while, the part was checked that the dust was very low and the lumps were easily removed.


              Attachments:

              in reply to: Urea Solution Storage Tank – Operation & Design #101943
              norozi1972
              Participant
                • Expert

                Dear friend
                In addition to the comments mentioned by friends:
                please be inform that during granulation washing time. the circulated urea solution must be diluted with injection of steam condensate and bring the concentration near 75%. Second action is reducing the load of plant during granulation washing time when the activity take a long time.
                with best regard
                Norozi
                Ammoniaurea.ir web site founder

                in reply to: Higher opening of Stripper level valve (LV-1011) #101942
                norozi1972
                Participant
                  • Expert

                  Dear Habib
                  we had faced like this situation during first start up a new stamicarbon plant,during start up we could’nt control the stripper level because a nut was on the seat of control valve .we s/d the plant and check the inside of the control valve and we saw the damage nut by stem forcing ‘
                  with best regard
                  norozi
                  ammoniaurea.ir website founder

                  in reply to: PH in urea synthesis #101755
                  norozi1972
                  Participant
                    • Expert

                    Thanks a lot Dear MARK
                    you mean that urea solution in synthesis behave like a acidic solution and the PH is less than 7.
                    as we know the ratio of N/C in syn is about 3 or more. that means there is an extra ammonia in the syn and the solution will be basis .
                    that is true or not?.
                    with best regard
                    norozi

                    in reply to: High dust formation in urea finishing technology #101696
                    norozi1972
                    Participant
                      • Expert

                      Dear nasseemce
                      In priiling tower the following item can increase the dust formation:
                      1) the ammount of water content in the product. Higher water leads higher dust.
                      2) the temprature of the product. Higher temp leads higher dust.
                      3) speed of bucket in the top of prilling tower. Higher speed leads higher dust.
                      4) the amount of Uf injected to urea melt solution. Lower UF injection leads higher dust.
                      5) the high temprature diffrent between the storage temp. And product temp. Higher delta T leads more dust.
                      6) the malfunctioning of the fluidized bed cooler.
                      7) the hight of the pile of urea inside the storage.
                      With best regard
                      Norozi
                      Persian ammoniaurea.ir web site foundr

                      in reply to: Condensation Corrosion in HP section of urea plant #101695
                      norozi1972
                      Participant
                        • Expert

                        Dear Friend
                        It depends to the steam pressure levels.I think 9barg steam preasure is perfect for eliminate the
                        carbamate condensation corrosion.
                        Best regard
                        Norozi
                        Persian ureaammonia.ir web site founder

                        in reply to: Reasons for Leak detection system choking #101675
                        norozi1972
                        Participant
                          • Expert

                          Dear Mark
                          can we use steam or steam condensate for removing any carbamate or urea behind the liner and immediately flush with purge gas like nitrogen .
                          with best regard
                          norozi
                          ( ammoniaurea.ir ) iranian web site founder

                          in reply to: bad performance of HP stripper #101670
                          norozi1972
                          Participant
                            • Expert

                            Dear Friends
                            I would like to add a few items that have an influence on the Stripper efficiency as follows:
                            1)Improper installation of stripper ferrules and their sheet holder .
                            2)Non-adjustable Stripper Shell Pressure(steam pressure and it’s Temperature)
                            3)non-uniform distribution of Urea solution all over the tubes .
                            4)High capacity of the plant.
                            5)Chocking and blockage in some of the holes of stripper ferrules by teflon or by corrosion material ( metal oxides )
                            6)Increasing of the diameter of the some holes of stripper’s ferrules due to corrosion and erosion.
                            7)Improper installation of teflon seal of the stripper’s ferrules.
                            8)Improper installation of verticality of the stripper.
                            9)Inappropriate Shell Stripper Level.(steam condensate)
                            10)Accumulation of more inert gas in the shell side.
                            11)Non-adjustable and control in Stripper level.(process side)
                            12) Increasing the amount of water in the synthesis of the plant (more H/C).
                            13)non-uniform distribution of the CO2 gas all over the tubes.
                            14)Increasing of the synthesis pressure.
                            15))Non-adjustable flow and Temperature of the CO2 to the stripper.
                            16)Increasing the amount of N/C ratio.
                            17)Improper reaction in the reactor and more carbamate to the stripper.
                            therefore some of the above items are process deviation and some of them are mechanical deviation. As Mr Mark and other friend’s mentioned before please check all process items in first and then you must shut down the plant and check all mechanical items one by one.
                            with best regard
                            norozi
                            (ammoniaurea.ir) iranian web site founder

                            in reply to: explosion limit calculation #101669
                            norozi1972
                            Participant
                              • Expert

                              Dear Mark
                              This is the download message:
                              “404 Article not found”
                              best regard
                              norozi

                              in reply to: Decrease biuret in urea prill #101591
                              norozi1972
                              Participant
                                • Expert

                                Dear Mark
                                can you send a brief description about urea crystallization process.(PFD – P@ID).
                                WITH BEST REGARD
                                NOROZI

                                in reply to: Drain ammonia to ammonia water tank or vent stack ? #101579
                                norozi1972
                                Participant
                                  • Expert

                                  quote mohamadkamal78 post_id=9300 time=1577558401 user_id=5652:

                                  So you are saying it is better to drain ammonia via vent stack that is right?

                                  Yes my friend

                                Viewing 15 posts - 1 through 15 (of 202 total)
                                UreaKnowHow

                                UreaKnowHow.com is an independent group of nitrogen fertilizer specialists with an impressive number of years experience in designing, maintaining and operating nitrogen fertilizer plants.

                                Solution Providers offer their solutions to improve our member’s plants performance.