ACE is very proud to have delivered the largest apparatus part in its successful company history of more than twenty years to a refinery in Romania. This was a top section of an existing vacuum column, which was prefabricated at the Lieboch and Maribor sites. Assembly took place in the halls at the heavy-load port of Linz, where the unit was loaded onto the inland vessel. Transport continues by ship on the Danube to Romania and then by truck to the refinery.