At one of the urea production complexes, process problems occurred in the second stage of the evaporation section. These problems were associated with the difficulties of maintaining a stable vacuum, both during operation and during the start-up of the section after a shutdown. During the overhaul period, a more detailed study was carried out and the physical defects of the internal devices of the vacuum ejection system were identified.
2024 08 Selianynov Incident in the vacuum ejector system of the second stage evaporation section