1978 Jojima Urea reactor failure

The exact cause of Reactor “A” fracture is extremely difficult to pin-point. A combination of factors as listed in Chapter 6 of this report might have acted concurrently. Two significant factors which contributed to the disaster were the plugged weep holes and the corroded liner shell and layer shells where initial failure was believed to have started. Once the vessel was rip open, this opening should have triggered vapor explosion.
It is recommended that the following steps should be followed in the future to minimize risk of such accident as happened in ABOCOL urea plant.
1. Increase number of weep holes and establish an automatic and reliable monitoring system during operation.
2. Keep weep holes always open and inspect for leaks periodically. Reactors should be shutdown immediately when a leak is detected.
3. Cautious inspection of inside and outside of the reactor should be carried out on a regular basis, at least once a year. Hydrostatic test should not be made unless very necessary.
4. Precautions should be taken when storing high pressure vessels in open place to avoid corrosion from outside.

Share this on:
Twitter
LinkedIn
UreaKnowHow

UreaKnowHow.com is an independent group of nitrogen fertilizer specialists with an impressive number of years experience in designing, maintaining and operating nitrogen fertilizer plants.

Solution Providers offer their solutions to improve our member’s plants performance.